Sibiu International Airport MASTERPLAN 2015
Sibiu Airport Modernization Program AECOM Revised Final Draft Master Plan 2015 Report on short, medium and long term
According to Romania's General Transport Master Plan, Sibiu Airport is currently classified as Regional Airport but is expected to develop into the International Hub Airport category later. The modernization project for Sibiu International Airport aims to provide necessary infrastructure capacity and operational facilities required by satisfaction level of air transport services in 2020 and 2025. The project includes:
- Expansion of passenger terminal by 2020
- Expanding passenger terminal by 2025
- Taxiway extension by 2020
- Analysis of the opportunity to develop a cargo terminal by 2020
Problems achieved
This intervention addresses the following issues:
- Lack of capacity of the terminal 2020
- Increased freight flows generated by international connectivity
The estimated costs of the project are the following (Million €, 2014 prices):
CAPEX
51
Includes:
• Extension of existing passenger terminal
• Taxiway extension
• The feasibility of developing a cargo terminal
• Upgrading the current lighting system, installation of a deicing equipment and a new lighting system
OPEX
2,5
Additional operating costs
Total 53.5
(Projects combined 2020-2025)
Results
PVC (€ (Prices 2014)) 64,912,841
PVB (€ (Prices 2014)) 651,827,026
NPV (€ (Price 2014)) 586,914,185
BCR 10.04
EIRR 34.9%
- In 2011, the airport recorded a total of 176,906 passengers (26,482 internal traffic and
150,424 international traffic). If the modernization program is implemented entirely,
the number of passengers could reach the figure of 1,517,611 by 2020 (329,756 domestic traffic and 1,187,865 international traffic) and 1,886,252 by 2025 (409,844 domestic traffic and 1,476,408 international traffic).